
The stretch of the Expressway at Amravati is 74-km long and Thackeray travelled 6 km on the stretch to check the quality and speed. Work on the project continued even during the coronavirus-induced lockdown, which is why most of it is complete, the chief minister said.
from Economy-News-Economic Times https://ift.tt/2KZT1bt
via
No comments:
Post a Comment